Close

3504 Results for "《 예약문의 OIO≡⑧④89≡83O⑥》레깅스룸견적よ레깅스룸ago레깅스룸メ강남레깅스룸eighty 선릉레깅스룸κ선릉레깅스⒲레깅스룸メc선릉레깅스룸literary"

  • Initial project Planning

  • After settling on an overall concept, we began to hash out a few details. Our plan is to create an easily extensible project so that we, or others, can refine and further extend R2 in the future.To this end our initial design was to create a multipurpose...
  • Hardware progress

  • 04.12.2014 (Kittan) Got the computer functional. We've got a vid card on order that'll handle screens 9-12 (so far the only out-of-pocket expense for the project) but I have a machine already running screens 1-8. 6 of them are touchscreens already hacked...
  • Frames and stuff

  • 04.15.2014 (Kittan) Novak left early, something about having to go be awesome and buttkicking, I dunno. But I think he got some work done on parsing map data and rendering. We'll probably reload the NotSoGreatway with debian tomorrow or someday soon...
  • Title? Pfft.

  • 04.16.2014 (Kittan)First coat of paint on the monitor housing faceplates. Novak and I took 'em out and shot 'em up with a .22 so they'll look all battle-hardened. Don't tell anyone, but first we tested penetration and shatter by shooting some plywood...
  • Thursday grumble grumble

  • 04.17.2014 (Kittan)Today was an interesting day. Well, not really. I got the housings finished up for the screens and all screens mounted within said housings. Last night we loaded some debian on the NotSoGreatway and found it lacking driver compatibility,...
  • Cheeseburger Day

  • 04.18.2014 (Kittan) Friday is officially Cheeseburger day around here.Also it took a day longer than it should have but we finally this afternoon got the multihead stuff to work. I fiddled with some older drivers last night, and Novak came in today with...
  • Hooray! etc

  • 04.19.2014 (Kittan) Turns out the backlight issue was actually a power delivery issue, which has been resolved. Also the RS232 USB adapters came in so we can hopefully get every touchscreen interfacing. Now I guess I get to start designing the frame,...
  • Ignore the product placement

  • 04.20.2014 (Kittan)Got the easy ones mounted on the frame. I'll need to add a second row of rail and figure out how best to mount the bottom 5 screens (making sure to leave room for keyboard arms and accessories), but it should be done sometime Monday....
  • Frame Completed

  • 04.21.2014 (Kittan)Well the frame is pretty much complete. I might still add some bracing, and at some point do something better with the base than the 1x4 screwed in there to keep it from racking, but it's functionally complete. We've got all 12 screens...
  • Hardware 95%

  • 04.22.2014 (Kittan) Sometime I still need to redo the base of the frame, and run the USB/serial lines for all the touch interfaces and optical drive, but that's pretty much it. All screens are mounted, as well as the keyboard, optical and the control...
  • Hardware Complete

  • 04.23.2014 (Kittan)The frame has been finished and bolted to a foot plank. All screens are mounted in final position, all cables (including serial and USB lines for touch interfaces) are run and secured. The whole thing has been shifted out of workspace...
  • Start # 1

  • So, the first issue is making it fly.  To that end, a few mods to a quad-copter were undertaken.  An under-frame was attached to allow a frame to be created for applying a skin outside of the propeller range.
  • Major changes to protocol

  • I had to think long and hard about whether it was a good idea to do this or not.  One of the major goals in the Universal Controller was to keep things as simple as possible.  Having all messages fit within one byte definitely helped this goal:...