Close

451 Results for "『 모든문의 OIO=5793=7458 』 선릉셔츠룸ㆌ ∩anyway≒강남셔츠룸강남셔츠룸∧warmly 강남셔츠룸셔츠룸사이즈 셔츠룸터치の셔츠룸테란мhearingキ"

  • X and Y Mechanics Completed, Partial Z

  • I finished cutting most of the wooden parts and assembled them, I cut all of the linear rod and the remaining threaded rod. Most of mechanical assembly is complete. I put together an end stop based on the DarwinOptoEndstop for the X axis and hooked up...
  • Completed X,Y and Z

  • I finished assembling the Z carriage, I had to reduce the flange on the anti backlash nut for the Z axis to fit the space in the carriage. Mounted a temporary end stop for the Z axis, it limits the travel a little bit but it will work until I can...
  • Dremel Mounted and First Cuts

  • I finished the first iteration of the Dremel mount (added to GitHub), while doing that I found a couple more changes to the Z carriage that I want to make. The Z Carriage needs to be about 6mm taller, it doesn't currently clear the Z stepper motor, so...
  • Aluminum Test

  • I haven't had a lot of time to work on this, but yesterday while I was doing something else I put a piece of 1/4" aluminum on it to see what happens. I wasn't expecting it to work, I assumed it wasn't rigid enough to actually mill the aluminum, but it...
  • Plumbing

  • Several pictures of the nearly finished plumbing.  The first is of the accumulator tank end:The accumulator tank is at the bottom.  I sourced a new, purged and never used LP tank from the hardware store to remove worries of residual propane...
  • Controller Modifications

  • I probably could use the paddle board pretty much as is, and reprogramming the existing SC87C451 microcontroller. There look to be extra GPIO pins available that I could use for my other required inputs and outputs. That said, I don't have the tools(compiler...
  • Not So Rapid Prototyping

  • I haven't been posting build updates as frequently because the build activities have mostly consisted of sanding....lots and lots of sanding.  The good news is that I'm nearly complete with the first flight quality propeller!  I've talked previously...
  • Powder and Dispenser

  • Powder tried:PowderResultPlaster + Talcum powderNot enough strength both immediately after print and after settingPlaster + sugar + dextrinIncrease wet strength, but very difficult to spread. Also very messy.Salt + dextrinGood wet strength, improved...
  • Changing out the bearings.

  • Time to change out the 4 main bearings on the spindle. There are lots of videos on these, but so far i've yet to see a complete one. They all go from here's the mil, til here's something then its done. We're got to a point where we were left scratching...
  • ballscrews n stuff

  • whoopsmade a dent in the insulation and then bounced off across the roommmca and I (and mr pika) stripped the G0704 down to its barebones, making two piles of parts one for not getting reinstalled and one for reinstall. i won't go over it here, since...