Close

139 Results for "↘ 최저가 Ò1Ò〈⑻⑷89〉83Ò⑥ ↗ 강남쓰리아워F グpossibility쓰리아워┃쓰리아워가격쓰리아워레깅스룸Iシ쓰리아워레깅스룸unnatural 쓰리아워ы쓰리아워레깅스룸㏅㈇temper"

  • Button selection

  • Requirement DurableBig enough but not too big that there's no more room for button caption.Withstand excessive force Selection 30mm arcade buttons DrawingSwitches are too big to fit at least 7 of them on a panel. Cherry MX keyboard switches Designed...
  • Getting Ready for "Mass Production"

  • While Looking for some ideas to minimize the printing and manual crafting time per-unit, my Fiance found the answer in the PlumbQqik PQC-104, a flexible end cap for sewers and drains. It turned out to be only a few millimeters off in both height...
  • Indecisions Already

  • Ok, I haven't touched this project much since my classes begun this year, but since I have started it I had 2 ideias for this project that meet my goals in one way or another.I have concluded that I can make the case 50% or even 40% of the original IBM...
  • Got NTC

  • I finally got them ! These are negative temperature coefficient resistors, or NTC. I measured about 104 Ohms at 28°C and the resistance should drop a lot under heat. Which is going to happen because I'll put one in series with the isolation transformer,...
  • Classic VGA

  • There was a completed version of the video system running a few months ago. Pretty much everything changed during the main software development and that also included the video modes. One change was to add the classic 60Hz VGA mode and allow even the...
  • Two Years Later

  • It's been a couple of months since the last update and more like three since anything meaningful changed. There has been (yet) another board revision and Rev. 8 is now good enough to actually solder the chips in place! Just like last year,...
  • Software overview

  • Wall-E's software took me quite some time to develop. In fact (as anticipated) it took much longer than 3D design, mechanical or electronic assembly, etc. Development was not linear. A couple of times, when frustrated by the bugs or unreliability, I thew...
  • Log 2: Energy Costs of a Portable Spa

  • When you spend 1/10 the cost on a spa, you have to wonder, what are you giving up? Jets (the portable units have bubbles - impressive, but not the same)built-in seatsbig, long-lasting filtersinsulationheater power The first 3 aren't a big deal....
  • Layout and Key Caps

  • When considering the keyboard layout, one has to think about what keycaps are available on the market. Those low-profile switches use non-standard keycaps, so I'm a bit limited. A quick search of Aliexpress reveled that I have a huge choice of 1u caps,...
  • Technical Part

  • Date: 14 / 8 / 2019 -  17 / 8 / 2019 Testing for capacitive sensing, LED strip and dc motor. Used random jumper wire and breadboard  •Touch on the copper tape to activate capacitive sensor. •Test on two LED, placed LED with the L298N....
  • Flood

  • As we dismantled out old battery rack we discovered that water flooded around a centimeter under the pallet. Its a (very) old basement and we discovered that during winter water infiltrate it and let the floor wet. This is a problem since the wood rot...
  • W25Q128 Removal

  • The first step is to remove the existing W25Q128 flash device and replace it with some pin header to connect up a custom board.  The 1.27mm pitch SOIC-8 package is pretty easy to remove.  First start by cutting each of the eight pins with a...
  • I got it centered

  • After many adventures I finally manged to get a proper readings from the analog. at first I tried to work it out using a 555 IC in monostable configuration and to read the result using the pulsein command. My first big task was to find the...