UNTIL NOW, I have always considered locating relays in the load center.

A refrigerator however could be modified to include the needed compressor relay. A logic signal is then exchanged, demand arbitrated by logic to switch the relay. AC wiring then remains the same, nothing new. LOW VOLTAGE signaling can be via wired connection, or wireless.